National Athletics Centre, Budapest

Hungary
The project features a primary pre-stressed cable net supported by an inclined two-chord compression rigid truss. This latter rigid steel structure forms the nodal structures mainly conducted by the tension of the cables. Inner and outer columns are supported at podium level by reinforced concrete elements. The nodal design task is typified by the 7-8 elements of nodes, complex loading scenario and geometry.