Idea Statica
  • Steel
  • Concrete
  • BIM & Workflows
  • Support & Learning
  • Pricing
  • Company
  • Steel overview
  • Connection design
  • Member design
  • Parametric design
  • Steel case studies
  • Concrete overview
  • Walls and D-regions
  • Anchoring design
  • Concrete case studies
  • BIM Overview
  • Supported integrations
  • Checkbot
  • Viewer
  • APIs
  • Support Center
  • E-learning & certification
  • Blog
  • Downloads & Licensing
  • Plans
  • Free community tool
  • Enterprise customers
  • Students & educators
  • How much will you save?
  • About us
  • Contact
  • Research & development
  • Authorized resellers
  • Meet our customers
  • Career
  • Steel
    Steel overviewConnection designMember designParametric designSteel case studies
  • Concrete
    Concrete overviewWalls and D-regionsAnchoring designConcrete case studies
  • BIM & Workflows
    BIM OverviewSupported integrationsCheckbotViewerAPIs
  • Support & Learning
    Support CenterE-learning & certificationBlogDownloads & Licensing
  • Pricing
    PlansFree community toolEnterprise customersStudents & educatorsHow much will you save?
  • Company
    About usContactResearch & developmentAuthorized resellersMeet our customersCareer
14-Day Trial
14-Day Trial

Subscribe to our newsletter

Company

  • About us
  • Partners
  • Careers
  • Patent

Resources

  • Customer projects
  • Case studies
  • Connection Library
  • Verification books

Legal

  • EULA
  • Global privacy policy
  • California Privacy
  • TOS Viewer
  • Licensing

Help

  • Contact
  • Quote request
  • Resellers
  • Downloads
FacebookInstagramLinkedInYouTube

© IDEA StatiCa 2009-2026

Trusted and used worldwide by engineers, fabricators & consultants.

CompanyCustomer projectsExtension of the Clarion Congress Hotel, Ceske Budejovice
Extension of the Clarion Congress Hotel, Ceske Budejovice
Concrete

Extension of the Clarion Congress Hotel, Ceske Budejovice

Czechia

The investor's plan dealt with the design and realization of an extension to the existing Clarion Hotel. The extension was divided into three different functional parts – a hotel part, a garage part and a part of the congress hall totaling seven storeys. The structural system of the hotel part was designed as a mainly transverse wall system with RC walls and slabs.

The structural system of the garage and the congress hall was designed mainly as a skeleton system with RC walls in both directions. All parts of the building extension were reinforced with communication cores along the height. 

The part of the congress hall was separated from the garage by an object expansion joint. The hotel section was horizontally supported on the columns and walls of the garage by sliding bearings. The foundations of the building were designed to be on drilled piles.

Gallery

1 of 6

Gallery

6 of 6
1 of 6