This tutorial demonstrates a real-world anchoring solution featuring a verified mixed anchor configuration proven in both calculation and construction.

Please note that this real-world design uses optimized geometry that may trigger standard EN detailing warnings. We retain the original parameters for authenticity. See the figure below.

inline image in article

If you wish to skip the Connection design and proceed directly to the Detail 3D analysis, download the Detail 3D file and continue to Chapter 5.

1 New project

Run the IDEA StatiCa Connection. Everything starts on the Steel card. 

inline image in article

Adjust default settings for Materials and click Create a blank design.

inline image in article

2 Design

After creating a blank design, change the Cross-section of a member to UB 610 x 305 x 238.

inline image in article

Now, add another manufacturing operation and select the Base plate.

inline image in article

Continue with the next Operation and choose a Fastener grid or Contact to produce Headed stud.

inline image in article

Add another one, Fastener grid or Contact to produce reinforcement anchors.

inline image in article

Change the rotation of reinforcement in operation GRD2 by selecting Editor.

inline image in article

Add a stiffening plate.

inline image in article

Weld the stiffening plate to the base plate by the General weld or contact.

inline image in article

Add the operation Cut of member.

inline image in article

Add the last operation in the Connection, Fastener grid or Contact.

inline image in article

Let's change the parameter Forces in to set the position of the hinge.

inline image in article

Input the internal forces for biaxially loaded anchoring.

inline image in article

 

3 Check

Switch to card, Check -> Calculate. The code check proves the failure mode on the anchors. By default, the concrete block is assumed to be cracked.

inline image in article

Let's explore the results. Select Equivalent stress, Bolt force, Mesh, Deformed, and Anchors. Generally, the table shows which anchors are approved and which are not.

inline image in article

Now, let's review the details of the failing anchors to identify which code checks are satisfactory and which are unsatisfactory.

inline image in article

Reason for Anchor Check Failure: 

  • According to EN 1992-4, Cl. 1.2(4), the design of anchor groups containing different anchor types is outside the scope of the standard. Consequently, the code-check fails by default. To verify this configuration properly, a detailed analysis using the 3D Detail module is required.
  • This limitation can be easily resolved in Detail 3D, powered by the CSFM method, which replaces the simplified analytical assessment in Connection with a rigorous 3D stress-strain analysis.

Supplementary reinforcement (EN 1992-4 – 7.2.1.9; 7.2.2.6):

  • The analytical code-check fails for the concrete cone, requiring supplementary reinforcement to transfer the full tension (356.3 kN) and shear (400.0 kN) loads. This is critical due to the "mixed" anchor configuration.
  • This limitation can be easily resolved in Detail 3D to confirm the reinforcement efficiency. If checking manually, assume zero concrete capacity and ensure the reinforcement area covers the total reported forces.

Embedment depth (EN 1992-1-1 – Equation 8.6)

  • The warning regarding insufficient embedment depth appears because this tutorial represents a real-practice example with a thin wall and shallow anchors. The design's structural integrity is proven further in the Detail app.

4 Export

Prerequisites for export: 

  • The model must be calculated, and the results included

Go to the card Check -> RC check -> Save.

inline image in article

The export is allowed only for the anchoring topology. The export allows the transfer of:

  • The concrete block
  • Anchors
  • The base plate
  • Loads

Additional information and parameters that are set according to the corresponding settings in the Connection:

  • Shear transfer (through Anchors, Shear lugs, and Friction) 
  • Material
  • Anchorage Type: Post installed (Adhesive) / Cast-in place
  • Anchorage type at the end: Washer/ Straight/ Hook/ Headed stud
  • Friction coefficient

5 Design

This section will allow you to modify Members, Supports, Loads&Combinations, and add Rebar assembly.

Support

In this example, the connection is anchored to a wall that is continuous on all sides. For such submodels, we use rigid supports with continuous reinforcement. This setup simulates the wall's continuity, allowing tension transfer despite the compression-only settings, without requiring complex stiffness definitions.

 Let's apply the supports to the model:

inline image in article
inline image in article

Transfer devices

The anchors are imported from IDEA StatiCa Connection. Since the design uses two different anchor types, we will separate the load transfer to ensure a safe and predictable behavior: This approach aligns with standard UK engineering practice to resolve the limitation of EN 1992-4 (Cl. 1.2(4)), which excludes mixed anchor groups from the standard scope. By assigning shear and tension to specific anchor groups, we create a verified load path compliant with safety requirements.

Anchors SF1 – SF6: Enable Active for shear transfer and disable Active for axial forces transfer.

inline image in article

Reinforcement anchors SF7 – SF10: Do the opposite – disable Active for shear transfer and enable Active for axial forces transfer

inline image in article

If you were designing a footing from scratch in the Detail application, both options would be enabled by default. When transferring shear, you must determine which anchors will resist the force and select them accordingly. This aligns with EN requirements, which specify that shear should only be assigned to anchors effective for the concrete edge failure check.

Reinforcements

Set the Concrete cover to 30 mm; this will serve as the default value for the reinforcement. Additionally, set the default Anchorage type for longitudinal bars and stirrups.

inline image in article

Next, insert a new Group of bars 3D (or copy the existing one) to create the continuous longitudinal horizontal reinforcement (main reinforcement at both surfaces).

inline image in article

Duplicate the operation to add the continuous vertical reinforcement at both surfaces and adjust the settings as shown below.

inline image in article

According to the structural calculations, additional shear reinforcement is not required outside of the shear perimeter. Therefore, the following steps focus solely on creating the shear reinforcement within the shear perimeter based on the original design.

Add another item by selecting Rebar-Assembly > Group of the bars 3D again, and modify the Properties.

inline image in article

Duplicate operation GB3D3 and update the options below to define the shear reinforcement.

inline image in article

Proceed by copying operation GB3D4 and changing the parameters.

inline image in article

Now, copy operation GB3D5 and modify the settings according to the shear perimeter requirements.

inline image in article

Reuse operation GB3D3 by copying it and adjusting the values.

inline image in article

Copy operation GB3D7 and change the options.

inline image in article

Create another copy of operation GB3D5 and apply the changes below.

inline image in article

Finally, copy operation GB3D9 and update the final reinforcement options.

inline image in article

Loads and combinations

Combinations are taken over from IDEA StatiCa Connection. All the consequences of import are mentioned
in this article.

Let's add the Self-weight:

inline image in article

Create a combination with Self-weight, and add the coefficient for self-weight = 1.35 according to the codes 
EN 1991-1-1

inline image in article

6 Check

Before running the analysis, we highly recommend changing the Mesh multiplier to 2 or 3 to speed up the calculation. While this step is not mandatory, it significantly reduces computational time and helps detect potential divergence issues early. If the analysis runs smoothly, you can then revert the Mesh multiplier to 1 for the final results.

inline image in article
inline image in article

Results

Equivalent Principal Stress

The equivalent principal stress (EPS) in concrete is determined based on the triaxial behaviour of the concrete block. The areas experiencing the highest loads are identified and highlighted. To provide insight into the effect of confinement compared to uniaxial compression, the equivalent stress is calculated using the kappa factor

inline image in article

Plastic Strain

To inspect the internal behavior of the concrete block, switch to the Plastic strain pl) view. Use the + New button to create Sections and adjust their Plane definition (position and rotation) in the properties window to cut through critical areas. This highlights where the concrete undergoes plastic deformation. You can save these views to the Gallery for your final Report. More information is available in this article.

inline image in article

Stress in rebars

The results display the σs / σs; yield ratio (stress to yield strength), identifying the most utilized bars via a color scale. Detailed values for stress, strain, and utilization for all bar groups are listed in the Reinforcement tab.

inline image in article

Similar detailed results are also available for Anchors.

inline image in article


Anchorage

Double-check the Anchorage settings and activate the Total Force in Anchors (Ftot). The forces in the anchors may vary slightly due to the different calculation approaches regarding the concrete block. The differences are not significant, though. 

inline image in article

The Anchorage tab verifies the bond strength between the reinforcement and concrete. It ensures that the provided anchorage length is sufficient to transfer the forces. The check compares the actual bond stressb) with the ultimate bond strength (fbd) to prevent pull-out failure. You can display these results separately for Reinforcement and Anchors.

inline image in article
inline image in article

Deformations

Switch to the Auxiliary tab and turn on Deformation. Although deformation limits are not prescribed for ULS (Ultimate Limit State), reviewing the deformed shape is a crucial sanity check. It ensures that the model is stable and not experiencing unrealistic displacements or rotations (e.g., due to disconnected elements). This visual inspection helps quickly identify any potential modeling issues.

inline image in article

7 Report

Finally, go to the Report-> Detailed ->Generate. IDEA StatiCa offers a fully customizable report to print out or save in an editable format.

inline image in article

You have performed a complete design check according to EN 1993-1-8 (steel joints), EN 1992-4 (anchors), and EN 1992-1-1 (concrete structures). The steel joint and anchorage were verified in IDEA StatiCa Connection, while the concrete block integrity and reinforcement were analyzed in IDEA StatiCa Detail using the CSFM method compliant with EN 1992-1-1